Property Type:
28Bis Mạc Đỉnh Chi, Phường Đa Kao, Quận 1
$33 /m²
Square:
m²Structure:
3 hầm, 16 lầuMin hiring duration:
2 nămRank:
Property Type:
Room Type:
Deposit:
Payment period:
Building Status:
Building Direction:
Five Star Tower with the advantage of being located in the economic - financial center of District 1, is unquestionably the best option for enterprises seeking comfort and the ability to reach out to potential consumers in all disciplines.
Building name | Five Star Tower |
Address | 28Bis Mac Dinh Chi, Da Kao Ward, District 1, Ho Chi Minh City, Vietnam |
Building structure | 17 floors - 3 basements |
Floor area | 480 x 15 floors 100m2, 150m2, 300m2, 400m2 |
Grade | A |
Direction | Northwest |
Rent cost | $33 - $43/m2 (Included taxes and fees) |
Management fee | $6/m2 |
VAT | 10% |
Car parking fee | 3,000,000 vnd/ car/month |
Motorbike parking fee | 250,000 vnd/motorbike/month |
Electricity fee | Private meter |
Over time fee | Negotiable |
Deposit | 3 months |
Payment | Quarterly |
The Five Star Tower was constructed on Mac Dinh Chi and Tran Cao Van streets. Connect to Le Duan and Pham Ngoc Thach Streets from there to:
– Metro subway station line 3 passes by the Zoo and Botanical Garden as well as Turtle Lake, and is about 1-2 minutes away by automobile. From Ben Thanh - Hang Xanh - Di An Station, this train line is convenient.
– City Post Office & Notre Dame Cathedral only 5 minutes
– The country's most contemporary business and office district: Lim Tower 3, Diamond Plaza, Vincom Dong Khoi...
– Major bank branches: ACB Saigon Branch, Techcombank, Vietcombank,etc.
Five Star Tower is located on a land area of 1,440 m2, of which:
– Total construction floor area: 13,074m²
– Total floor area of tower block: 9,360m²
– Total area of basement for parking: 3,714m
– Number of floors: 16 floors – 3 basements
Design of Five Star Tower:
– Overview: Developed and technically designed by DCM Studios Hong Kong, the overall idea of the project is to create an attractive landscape with Vietnamese identity. Appreciate the suitability for long-term settlement communities and sustainable ecological environment.
– Hard core:
+ The entire technical system of the building (elevator and lobby on each floor) is concentrated in the right corner of the building, helping to reduce the area of intersection corridors.
Next, the toilets for the exit stairs are arranged in direct contact with light and natural ventilation. Thus ensuring good operation in all cases and saving energy.
– Working space:
+ Each office has an area of 100 - 150m² or it is easy to divide the space when you need to redecorate
+ The office for rent is arranged around the elevator, so go to the lobby on each floor as quickly as possible
+ All offices have 2 directions of exposure to natural light outside
Ms. Grace Nguyen
Services fee:
Parking fee:
Electric water fee:
Other fee:
Hottest